The plumbing contractor must notify pwd wtr at 215 397 7097 at least 48 hours before connection to schedule the inspection of the sewer connection.
Connection of sewer to floor.
The connections to the city s sewer lines must be inspected by a pwd wtr inspector from the beginning to the end of the connection installation.
Your home s drainage system carries water and waste from fixtures and appliances to an underground drain line that leads to the main sewer.
Fold in sewer connection when the city sewer is only one size larger than the connection size required and no spur exists a sewer contractor must fold in a new spur in most cases.
If nothing drains into the floor drain prevent sewer odor by pouring a pitcher of water down the drain every couple of weeks.
A properly installed toilet to floor connection is vital to not only prevent the occurrence of leaking from underneath the toilet bowl but also prevent sewer gases from entering the room and house through the drainpipe.
It is usually found in a cap or hub mounted to a 3 to 4 inch diameter pipe that rises out of a slab floor in a basement or utility area.
Sometimes it is mounted flush into the floor.
If your floor drain connects to the sewer system and you smell sewer gasses the trap beneath the drain is dry or the plug for the cleanout is missing.
Sewer line installation in floor joists.
Sewer line clean out.
This typically occurs when the public sewer is 8 which a size no longer legal as a public sewer in nyc and a 6 connection is required.
Spread some petroleum jelly on the pipe face as a lubricant and push the coupling onto one of the pipes.
Illicit connections may be intentional or may be unknown to the business owner or homeowner and often are due to the connection of floor drains to the storm sewer system.
Insert the pipe until it hits a notch at the halfway point which correctly seats the pipe.